Underground Utility Locating Case Studies

Environmental and engineering firms often are tasked with performing soil borings for monitor well installation as part of a Phase II Environmental Site Assessment.

An expansion was planned at a power plant in west central Florida. As part of the design build plan, all of the utilities within the proposed building footprint had to be located and mapped.

As part of an Phase II Environmental Site Assessment at a gasoline station, GeoView was tasked with locating and mapping the utilities within the boundaries of the property.